Appendix H: Tower crane inspections checklists (informative)

Note: These inspection checklists are provided only for reference. Inspection Bodies may arrange and change the format to meet their own requirements.

Table H1: Guidelines for Tower Crane Inspections

Inspections will cover, but are not limited to:

1. Jib Configuration 2. Tower configuration 3. Undercarriage
Jib length Number off Undercarriage type
Self-erect version Tower type Gauge x wheel base
Hoist type Length of towers Identity
Counterweight Identification checked Central ballast weight
Counterweight blocks 1st tie-in type
  Identification
  Location
Block arrangement
Job identification and insert order 2nd tie-in type
  Identification
  Location
 
Jib tie bar (ropes) lengths (in order from tower head) 3rd tie-in type
  Identification
  Location etc
 
Jib tie bar connection on jib/pennants/luff ropes/bridle connection    
Counterjib/insert identification and order    
Counterjib tie bar/rope identification    

The configurations above must be certified as being in accordance with the requirements of the Approved Code of Practice for Cranes for wind and seismic conditions.

4. Documentation and Certificates 5. Undercarriage Inspection 6. Tower System
Manufacturer's certificate Identity check Identity check
Design approval certificate Rail condition Bolt identify and condition (if applicable)
Hoist rope certificate Rail earthing Bolt torque check
Trolley rope(s) or luff rope certificates Rail clamps Pin joints (if applicable)
Counterjib holding rope certificates (if applicable) Limits set Binding points
Jib holding rope certificates (if applicable) Rail stops Accessway
Other/counterweight rope certificates Bogie/wheel condition Rust
Hook certificate Machinery guards Tie-in assembly
Tower head bolts crack test certificate (if applicable) Safe clearances Tie-in supports
Slewing bolts crack test certificates (if applicable) Central ballast check Lattice condition
Tower bolts crack test certificates (if applicable) Rust condition Tower alignment
Slewring report Split/safety pins Cable support
Foundation/tracks certificates with drawing Accessway Earthing
Foundation anchor crack test certificates Cable drum Tower orientation
Tie-in supports engineering certificates Motion check  
Erection certificate Motion test  
Bolt spanner accuracy certificates Limits function  
Test weight certificates Brake function  
Counterballast weights weigh certificates Cabling  
Central ballast weights weigh certificates Switchboard safety  
Electrical certificate of compliance Earthing  
Crane log book in cab Prelimits  
Crane manual on site    
Radius/capacity in cab    
Clash zone procedure    

7. Cabin Section 8. Tower head / A-frame 9. Counterjib / machinery check
Identity check Identity check Identity check
Slewring report Bolt identity and visual condition Pin connects
Access Bolt torque check Split/safety pins
Slew brake condition Overload mechanisms Support system
Slew brake working Pin connections Hoist unit anchorage
Free slew check Split/safety pins Counterweight check
Rust Rust Counterweight security
Cab visibility Lattice condition Platforms; handrails
Cab safety Accessway Machinery safety
Deadman Pulleys Rust
Horn Boom buffers Hoist condition
Fire extinguisher Anemometer Hoist rope anchorage
Radius indication   Hoist rope inspection
Visual warnings   Hoist rope identity
Motion test   Motion test
Machinery safety   Hoist limits
Switchboard safety   Prelimits
Main switch function   Boom limits
Transformer mountings   Switchbox safety
Instrument operation   Cables (trip hazard)
Anemometer readout    

 

10. Phase failure protection 11. Jib 12. Hook
Tested as effective Configuration check Identity check
  Identification check Safety catch
  Pin connections Thrust bearing
  Tiebar/pennant configuration check Rope guards
  Tiebar/pennant identification check Pulley
  Lattice condition General condition
  Rust general Deformation measurements
  Rust in main chords Wear measurements
  Split/safety pins  
  Accessway 13. Test and calibration weights
  Fall-arrest system Maximum load
  Trolley gear condition Load at maximum safe working load
  Trolley gear brake Calibration
  Trolley rope inspection Overload warnings working
  Limit mechanisms  
  Trolley general  
  Trolley wheels  
  Trolley tension set  
  Trolley rope pulleys  
  Trolley rope anchorages  
  Hoist rope anchorage  
  Motion test  
  Limits  
  Counterweight sheaves  
  Counterweight rope adjustment  
  Hoist sheaves  
  Hoist deflector  
  Load pin  
  Boom buffer mounts  

 

13. Test and calibration weights
Maximum load
Load at maximum safe working load
Calibration
Overload warnings working