TOWER CRANE CLIMBING FRAME INSPECTION TEST REPORT/WORKSHEET

Proposed Ground Inspection Date:........................

KEY PERSONNEL

Crane Supervisor: Inspector:

IDENTIFICATION

Owner/Controller: Site Address:
Address:  
  Yard Address: (If appl)
   
Climbing Frame Model: Serial No: File No:
Manufacturer: Other Identification:

GROUND INSPECTION (Inspection Valid for 12 months)

Structure: Corrosion:
Pins: Split Pins:
Bolts & Nuts: Rollers:
Hydraulic Hoses and Fittings: Hydraulic Cylinder & Ram:
Handrails: Platforms:
Rails: Rail Components/Wheels:
Elect. Plugs & Cables: Hydraulic Fluid Level:
Pressure Gauges Climbing Feet & Mechanicals:
Comments:
 
 

Inspector Signature.................................

Date:..........................................

PRE- OPERATION INSPECTION 1. (Inspection valid for one climbing sequence only)

Correct Installation: Handrails & Platforms:
Pins: Split Pins:
Bolts & Nuts: Rollers:
Elect Plugs & Cables: Rail Components/Wheels:
Hydraulic Fluid Level: Hydraulic Tank Breather:
Power Supply: Hydraulic Pump Rotation:
Hydraulic Hoses & Fittings: Cylinder Operation:
Gauges Working: Manual On Site:
Comments:
 

Climbing Supervisor.................................

Date:..........................................

PRE- OPERATION INSPECTION 2. (Inspection valid for one climbing sequence only)

Correct Installation: Handrails & Platforms:
Pins: Split Pins
Bolts & Nuts: Rollers:
Elect Plugs & Cables: Rail Components/Wheels:
Hydraulic Fluid Level: Hydraulic Tank Breather:
Power Supply: Hydraulic Pump Rotation:
Hydraulic Hoses & Fittings: Cylinder Operation:
Gauges Working: Manual On Site:
Comments:
 

Climbing Supervisor.................................

Date:..........................................

PRE- OPERATION INSPECTION 3. (Inspection valid for one climbing sequence only)

Correct Installation: Handrails & Platforms:
Pins: Split Pins
Bolts & Nuts: Rollers:
Elect Plugs & Cables: Rail Components/Wheels:
Hydraulic Fluid Level: Hydraulic Tank Breather:
Power Supply: Hydraulic Pump Rotation:
Hydraulic Hoses & Fittings: Cylinder Operation:
Gauges Working: Manual On Site:
Comments:
 

Climbing Supervisor.................................

Date:..........................................

PRE- OPERATION INSPECTION 4. (Inspection valid for one climbing sequence only)

Correct Installation: Handrails & Platforms:
Pins: Split Pins
Bolts & Nuts: Rollers:
Elect Plugs & Cables: Rail Components/Wheels:
Hydraulic Fluid Level: Hydraulic Tank Breather:
Power Supply: Hydraulic Pump Rotation:
Hydraulic Hoses & Fittings: Cylinder Operation:
Gauges Working: Manual On Site:
Comments:
 

Climbing Supervisor.................................

Date:..........................................

"tick. " means "Done"; "X" means "Concern!, - refer Notes";